The efficient solution for wind turbine foundation construction
Why Choose HumeBASE?

Fast
Up to 45% faster construction time compared to cast-in-place solutions1
With majority of construction done in the factory, there is reduced potential for weather delays

Efficient
70% less concrete placed on-site using precast foundations
Fewer deliveries — 59 loads vs 310

Low-Risk
Smaller crews and reduced OHS risk
Consistent quality for all precast foundation components
HumeBASE delivers a smarter way to build wind turbine foundations — with faster installation, reduced site risk, and up to 70% less on-site concrete. It’s a high-performance solution designed for remote projects where certainty, efficiency, and sustainability matter most.
Access the Full Brochure
Learn more about how HumeBASE can support your next wind energy project — with detailed specs, benefits, and site data.

Register to download the full PDF brochure.
Notes
1.Based on foundation components fabricated offsite for a 6.2MW /152m turbine mounted on a steel tower. Actual construction time will depend on wind tower specification and site conditions.