Canberra Light Rail Stage 2A

 

FutureCast Low-Carbon Solutions
Project Overview

Location: Canberra, ACT

Sector: Transport Infrastructure

Principal & Contractor: Canberra Metro Construction

Solutions Used: FutureCast® Precast Box Culverts (25% Fly Ash Replacement) | FutureCast® Precast Concrete Pipes (30% Fly Ash Replacement)
 

jack-mccracken-9owjhumxfbk-unsplash-43.png
canberra-light-rail-photo-3.png

Background

Extending Canberra’s Sustainable Transport Network

The Canberra Light Rail Stage 2A project extends the tram network south from the CBD to Commonwealth Park, boosting connectivity and promoting sustainable transport. The project also integrates a major stormwater upgrade to better protect the city centre from flooding during more frequent and intense rainfall events.

 

Key Challenge

Balancing Carbon Reduction with Flood Protection

The project set ambitious sustainability targets, including a 25% reduction in Scope 3 emissions. At the same time, the city centre required new drainage systems capable of handling a 1-in-100-year storm event and a projected 20% rise in rainfall intensity. This required precast products that could both reduce embodied carbon and deliver reliable, large-scale flood resilience.

Background

Extending Canberra’s Sustainable Transport Network

The Canberra Light Rail Stage 2A project extends the tram network south from the CBD to Commonwealth Park, boosting connectivity and promoting sustainable transport. The project also integrates a major stormwater upgrade to better protect the city centre from flooding during more frequent and intense rainfall events.

 

Key Challenge

Balancing Carbon Reduction with Flood Protection

The project set ambitious sustainability targets, including a 25% reduction in Scope 3 emissions. At the same time, the city centre required new drainage systems capable of handling a 1-in-100-year storm event and a projected 20% rise in rainfall intensity. This required precast products that could both reduce embodied carbon and deliver reliable, large-scale flood resilience.

canberra-light-rail-photo-2-2x-upscale.png
canberra-light-rail-photo-1-2x-upscale.png

Outcome

Lower Emissions and Greater Resilience

The project achieved a 25% reduction in Scope 3 emissions across precast components, while also upgrading the city’s stormwater network to protect against flash flooding. The new pipes and culverts are designed to manage a 1-in-100-year storm event, safeguard Lake Burley Griffin from polluted runoff, and support Canberra’s climate resilience.

Additional sustainability measures included solar-powered compounds and recycling more than 95% of construction waste.
 

“We’re setting new expectations for sustainability... It’s an exciting opportunity to set new standards, not just for this project, but for the ACT as a whole.”

Mia Deans| Sustainability Lead, Canberra Metro

The Canberra Light Rail Stage 2A highlights how Humes’ FutureCast technology and stormwater expertise can deliver both carbon reductions and climate resilience for major infrastructure projects.