Precast solutions
Tunnel and shaft solutions
Segmental tunnel linings

Our segmental tunnel linings uses the latest technology to deliver a smooth bore, single pass tunnel, which can withstand the demands of modern tunnel boring machines and poor ground conditions.
Segmental tunnel linings
Segmental shafts

Segmental shafts provide a viable alternative to the techniques traditionally undertaken in Australia for the construction of permanent and temporary shafts.
Segmental shafts
One piece shafts

Humes also offer a range of standard one piece caisson units suitable for fast and simple construction of small diameter shafts.
One piece shafts
Precast arches

Humes has developed a large range of custom designed arches that are ideal for a variety of complex heavy loading criteria and internal envelops.
Precast arches
SRCP

Large diameter reinforced concrete pipes are an ideal solution for escape tunnels where heavy loads will be imposed.
SRCP
Clay jacking pipe

Humes are exclusive suppliers of the Steizeug Keramo® clay jacking pipe. The clay jacking pipe is more suitable for small to medium size diameters where there is no requirement for pipe lining.
Keramo clay pipes
Corrugated metal pipe (CMP)

CMP is a helically wound, lock seamed corrugated metal pipe which is suitable for mine portal access or escape tunnels for a short-to-medium design life.
Corrugated metal pipe (CMP)
Portal culverts

Humes manufacture extra large spaned box culverts for safe access to mine and construction sites and as conveyer tunnels.
Portal culverts



